• Breaches in Deg and Bherr nullahs erode bridge foundations • Trains bound for Karachi diverted via Sahiwal and Khanewal • Engineering teams waiting for water to recede before making repairs • Tarbela nears maximum capacity; PMD warns of continued flood risk in major rivers LAHORE: As the Ravi and Chenab rivers continue to flow at medium and low flood levels, respectively, breaches in Nullah Deg and Bherr have wreaked havoc across the catchment area, eroding soil beneath railway bridges and forcing the suspension of rail traffic on the Lahore-Faisalabad section via Shahdara and Sheikhupura. Flooding caused breaches at 25 locations along the route. “Following the massive floodwater…
Floodwaters sever rail link between Lahore, Faisalabad
Advertisement
Leaderboard ad — 728×90
Advertisement
In-article ad — fluid
This is a curated summary. The full report, with all details and context, is available from the original publisher.
Read the full story at DawnHeadline, summary and image are © Dawn and are shown here under standard aggregation practice with full attribution. News Inspection does not claim ownership of this reporting.